It doesn’t look like much is happening from the outside of the building as of late, but there’s a lot going on inside & underground! Our newly drilled well has been installed along with the plumbing. We’re currently waiting for our parking lot installation (most contractors keep wanting to make it far more elaborate than I), the remaining construction on our driveway, and our septic system. Inside however, the framers are knocking it out of the park! From the looks of it, my husband, a trim carpenter by trade, and I will get to begin adding in character the week after Thanksgiving! Follow along on our From6thCollective IGTV feed.